$2M+
Cumulative business sales across large multifamily contracts and a high volume of smaller projects.
Adventurer, ultrarunner, business owner and hands-on field operations professional with 25+ years of practical project delivery.

A Red Seal Carpenter and specialty contracting business owner, Shannon has worked across public infrastructure, justice facilities, technical installations and endurance-event operations. His experience includes Clerk of Works and contract administration assignments on 14 OPP facilities, including lead architectural contract administration across nine overlapping Phase 2 sites.
Red Seal Carpenter; approximately 13 years in architectural contract administration and Clerk of Works roles, including public and private projects.
Owner/operator of SHANCO Inc. / The Porch Doctor: more than $2 million in cumulative sales, six major multifamily apartment contracts, and over a decade of specialized coating and railing experience. Responsible for business development, estimating, contract delivery and field quality. SHANCO is a separate business.
Developed staff movement and checkpoint plans for Spartan Agoge March; supported race timing, check-in and overnight athlete accountability at Endurance Society events.
Supported a multi-state endurance expedition as crew chief for part of its journey, including mobile logistics, venue engagement and crew support.
Hands-on installation and site coordination experience, including Shedd Immersion Theater work in Chicago.

Not just a contracting role: Shannon built and operated a specialty contracting business, taking responsibility for the commercial decisions and the quality of the finished work.

Through SHANCO Inc. and its operating business, The Porch Doctor, Shannon developed a reputation for specialized liquid-applied Flexstone urethane coatings and premium aluminum railing systems on residential and multifamily projects. He managed the complete process—from customer relationships, sales and pricing to material planning, scheduling, installation and final quality control.
Cumulative business sales across large multifamily contracts and a high volume of smaller projects.
Approximately $800,000–$900,000 in sales from six larger apartment and condominium contracts.
Hands-on specialization in Flexstone systems, balcony restoration and railing installation.
Business development, contract negotiation, estimating, procurement, crews, installation and client delivery.
Representative projects include Blackstone Condominiums (Waterloo), The Jake and Moda (Kitchener), Hush Collection and Max (Kitchener). His work included a successfully executed approximately 13,500-square-foot coating project in 2021–2022.
Why it matters: The Porch Doctor demonstrates the ability to build a business, win and deliver substantial contracts, manage resources and solve practical field problems—not simply oversee work from a desk.
Two forensic identification assignments, three Phase 1 buildings and all nine Phase 2 detachments. Roles progressed from Clerk of Works to lead architectural contract administration.
Read the OPP case study ↗Courthouses and Crown Attorney offices across Ontario, plus forest fire management centres in Sudbury, Haliburton and North Bay. Quality assurance, field reviews, documentation and site management.
Review the project record ↗A broader background that allows Shannon to contribute to construction, live production, race operations and other demanding field projects.

Architectural contract-administration and site experience across major public facilities.
Explore experience ↗
Practical technical installation and coordination in a production environment.
Explore experience ↗
Operational planning and field coordination alongside the race director and staff team.
Explore experience ↗Shannon’s experience in demanding events comes from both sides: years of participating in endurance challenges and helping others make them happen.
Completed the 100-mile distance in Vermont in approximately 35 hours and 48 minutes, following multiple attempts at the event over the years.
Spent approximately 18 hours tackling the Survival Run and reached the finish area. Not recorded as an official finisher following a race-management group hold.
Completed a GORUCK Light in Buffalo in 2013 and The Unnamed endurance event in Wales in 2014, lasting approximately 20 hours.
Attempted Zion 100 in 2025 (approximately 46 miles) and Tunnel Hill 100 in 2025 (50 miles). Also completed a 100K distance at Run Woodstock after changing from a 100-mile entry. These are not presented as 100-mile finishes.
More than recreational rides: multi-week journeys requiring camping logistics, equipment management, route planning and adaptability.

Travel across Canada and the United States, beginning with two trips as a passenger alongside Shannon's father in 1990 and 1994.
Six later journeys lasted approximately 21 days each, typically involving motorcycle-carried supplies and tent camping.
Estimated distance on each of the six later trips; approximately 36,000–60,000 km combined. Includes a 2021 cross-Canada trip to British Columbia with Mary and Shannon's father.
Trips primarily involved established or dispersed camping, with occasional hotels. Duration and mileage for the 1990 and 1994 trips remain unconfirmed.